Louisiana · section planning

Mine sections & plant output

Draw a footprint, choose the mining depth, and estimate recoverable products, value, and plant time.

Open 3D model →
Planning model · provisional boundary · legacy pond depletion awaiting mapped perimeter

Geology is interpolated from six drill holes. Depth is below local modeled ground. Areas, recovery, density, TPH, prices, and costs remain planning assumptions. The reported 30-acre pond was previously mined to approximately 25 ft; its depletion cannot yet be located in a selected section. Saved scenarios do not change geological inventory.

1 · Map your section

Tap to add a vertex · Finish polygon to close · North ↑
Add at least three vertices inside the outline.
Enter coordinates or review vertices

    2 · Depth & plant

    Run 99200083 · 25 × 25 × 1 ft cells · 97.9 lb/ft³

    Recovery applies to geological products. TPH is dry tons of total feed per productive hour, including waste. These are editable assumptions.

    Mining & plant operating budget

    Current portal rates are loaded at each estimate and PDF download. Payroll and the planning tax reserve are included automatically. Other costs require review.

    Known waste bypasses processing. Unclassified material is charged processing with no revenue. The production burden is a portal allowance; additional monthly budgets must exclude costs it already covers.

    Product prices & royalties
    Additional plant cost per hour
    Leave at zero when plant costs are already included in cost/feed ton. An hourly cost makes contribution sensitive to TPH.

    Draw and close a section to begin.

    Saved mining sections

    Candidate dredge cut0–25 ft · 576,794 saleable tons · 80.0% recovery · 290 TPH
    Open section